Showing posts with label quilt. Show all posts
Showing posts with label quilt. Show all posts

Friday, September 10, 2010

Trying to work on a quilt

Trying to take measurements for the borders, as you can see, didn't get far.  Three of the four cats  have checked it out today.  I might have to go to the quilt store tomorrow to work on it.

Updated: 9-11-10  I was able to put the borders on, now to book time on the long arm machine.

Friday, August 20, 2010

Pineapple blossom quilt

I just need to add a label, than I'll have a finish this week.  :-)
The pattern is off of Bonnie Hunter's website:  http://www.quiltville.com/

Been busy with the Ahoy Scraps Quilt

<>Scrap Ahoy with red borders. 
<><><><>
Scrap Ahoy
























What do you think of the red strip?  Maybe 3.5 inches or the same as the other two? I wanted to get this quilt finished this month, so many so close on being done.
Ok went with 4in border, always can cut back, I think I'll use scrappy white for binding. 
So tell me what do you think??   Want opinions.

Sunday, May 10, 2009

Stashbusting week 19

Been working on this quilt for awhile. My figures for stash are still the same, nothing in or out yet. I think I need 15 more flowers.
Fabric Added this week: 0 yards
Fabric added to date: 17 yards
Fabric used this week: 0 yards
Fabric used year to date: 17.5 yards
Net fabric year to date: .5 yards
Used Spools YTD: 6 I finished one this week :-)
I really am sewing, it's been hand sewing! I got 3 Grandmother Flower Garden flowers sewn on. I think, I have ten million hexagons on that quilt. The other reason I'm so slow, I have helpers.
Happy Mothers Day.
My day started at 5:30 am
1. Weight Watchers (gained)
2. Laundry (even did the dog's bedding)
3. Vacuumed
4. Washed kitchen, front entry floors
5. Pick up house, I'm a collector of stuff-- went thru some stacks - that was exhausting for the brain-- just need to let it go..... pac rats understand :-)
6. Hubby called, left message to pick up land mines (from above mentioned dogs)
7. Daily walk (ok when I have energy walk-- 1 mile)
8. Re-vacuumed -- one of the above mention dog, thought it was fun shedding HER toy- she looks so innocent in that picture, tilting her cute head. She barely rest, always watching you.
9. Cut more hexagons for 3 more flowers,
10. Watching a movie, computer time all before 2:30pm
So how is your day going?

Sunday, March 1, 2009

Stashbusting week 9

Still haven't finish a quilt yet, but I'm working on some. When I finish these quilts, I'll have some nice numbers to share. The first one, I'm adding sashings to the blocks. I did those while sewing the log cabin blocks together. Bonnie Hunter's leaders and enders tip http://www.quiltville.com/leadersenders.shtml

Wednesday, February 25, 2009

what is your thought?

Should I put sashing and cornerstones on this quilt? The whites are different, so it will break it up. These blocks were a swap I did online, about 4-6 other quilters worked on the blocks. It would help, not aligning the seams, and also enlarge it about 10" on the width and 12" on length.

Sunday, February 8, 2009

Stashbusting week 6

Same as last week nothing done,just nothing to report used yet. I was working on a new top last week, not finished yet, need borders, my grandson picked out the frog fabric and colors. Yum Yum approving of the top, and Jack sleeping in Grandpa's lap.
Fabric added this week : 0 yards
Fabric added year to date: 17 yards
Fabric used this week: 0 yards
Fabric used year to date: 16.5 yards
Net fabric year to date: -.05
Still haven't used any in stash.
Used Spools YTD: 3

Sunday, January 25, 2009

Stashbusting week 4

Finished the quilting and binding to the blue quilt. 1st picture is the back, with a leftover block and Chester checking it out. The top was a block exchange I did about 5 years ago. Funny thing, I never took it out of the envelope till last week, turns out I recieved 5 of my blocks back. The one on the back only measured 11.5 inches instead of 12.5. I knew going in, you never know what your going to get back. I only have about 15 more exchanges to do lol.
Working on a string quilt, that I started 3 years ago. Been sewing pieces together to make the back. Not sure how to quilt it, I had washed the top, so the seams are matted together a little.
Fabric added this week : 6 yards
Fabric added year to date: 17 yards
Fabric used this week: 6 yards
Fabric used year to date: 16.5 yards
Net fabric year to date: -.05
Used Spools YTD: 2

Sunday, January 18, 2009

Stashbusting week 3

Ok, onto week three!
Haven't really had time to sew, trying to squeeze it in today. I'm working on a couple of things today. 1. The back to a blue and white top I found, while looking for something else. UPDATE 1/18 : sandwiched to quilt tonight or tomorrow AM
2. Some kangaroo binders-- a giant triangle with a baby print on top for charity, hmm should work on those tomorrow, since the President elect wants MLK day to be for charity. (the binders are used in nicu, for newborns and parents -skin to skin wrap)
3. Couple of blocks for Thimbleberries quilt, I just started.
4. Finished sewing the binding on my colorful quilt.

Fabric added this week: 6 yards Fabric added year to date: 11 yards

Fabric used this Week: 2 yards Fabric used year to date: 10.5 yards

Net fabric year to date: -0.5 yards

I was reading some ones post about use of spools: Used 1 large spool

Sunday, January 11, 2009

Week 2 Stashbusting

I'm working on the binding at this time. I'm guessing I used about 4.5 yards, quilt is 48x66. Definitely out of my color box, but I like it. Polo just knows I'm hiding something under the quilt too!
Fabric added this week: 0 yards
Fabric added year to date: 5 yards
Fabric used this Week: 4.5 yards
Fabric used year to date: 4.5 yards
Updated: finished 1-13-09

Tuesday, December 16, 2008

Jack's Quilt

I have finished Jack's Christmas Quilt. Those are grandpa's feet and fingertips holding the quilt.

He also chipped away all the ice on the walkway, we are to have freezing all this week. Going to hate to see the heating bill next month.

Thursday, September 25, 2008

Really been sewing

I have 3/4 of a flower done. Been working on a race car quilt for my dgs, I think I need another 4 rows, it will have sashings between rows. I'm posting a finished quilt for another co-workers dgs. I finished about 10 baby string blocks for baby quilts, I donate. Also I have been cutting my fabrics into 2 1/2 strips. I went shopping today found a sale at Sears, they had clothes clearance with another 50% off. So needless to say my dgs, will be getting a lot of clothes.

Thursday, September 18, 2008

Another update on the quilt

The count on the Grandmother Flower Garden quilt is now at 85. This picture has 83, but I finished another 2 on Wednesday night. I'm thinking I'll need another 35 at least. I figured 9 and 10 flowers to rows for 12 rows.

Wednesday, August 27, 2008

Finished another 3 flowers

Here is the quilt so far 78 done, the red,white blue was the 76Th block. As you can see the quilt pretty much covers the bed. I have been trying to decide how far to go, on the sides. Decisions, decisions.... The other thoughts are: do I make half blocks to finish these, so it is squared. Or just finish the edges as the flower shapes. Or fill in with white than one row of a color. Major thinking here. Not to much happening for a wednesday: laundry, cleaning house, I have most of it done by 2pm. Even went to Sheila's baby shower this morning at work, she saved the quilt to last. All the co-workers want quilts now to funny.

Sunday, July 13, 2008

Update on quilting

Turtle quilt is finished for Sheila's baby in Sept 2008.
The grandmother flower garden now has 70 Flowers completed.

Wednesday, January 30, 2008

I have a finish

I finished Yissells quilt today. Been working on the Grandmother Flower Garden, I now have 44 done 56 to go..... Here is a picture of the quilt.

Wednesday, January 16, 2008

Another lazy day

So here it is another 10 days have past, been working on the flowers. I doubt I even got one done. I have been trying to figure out the time, so far it takes 15 mins to sew three sides to the flowers. I'm sure that will improve as time goes on. I get to sit for Jack tomorrow, nana's day to spoil :-)

Monday, December 31, 2007

New Years Eve

Here is my last post for the year. I haven't taken the opportunity to sewn very much this week. I did get 2 more flowers done, now at 34. I hope to the start the new year with sewing tomorrow. I have my coworkers baby quilt top finished, just need to do the back, and quilt it. I have made some new plans, for this year: Try to sew a flower up every two days, might have all flowers done by August. Plan to lose some weight, either on me or at least my fabric. Try to re-train that crazy Yum Yum, with manners :-) Of course, try to get back on a sleep schedule again. You know you have watched a movie to many times, when you start to see the flaws lol. I guess it is time to watch a new one. "Well it is Jan 1, 2008" The neighbors doing fireworks in the school lot, the cats are freaking out. Thought Abby was going thru the roof with Chester. Heathcliff and Polo slept thru it.

Sunday, December 23, 2007

Christmas is almost here

Christmas is almost upon us. I feel relieved about it, all that needs to be done is Christmas dinner. Got all the gifts wrapped in time, there isn't any quilty items this year. I have gotten a few ideas over the past month reading other blogs that I want to try. What I'm working on is a hand piece Grandmother's flower garden. I still wonder WHY I did this!!! and you need your head checked out lol. I was trying to figure how much time has gone into it. I'm using the plastic hexagon disks. So far to baste fabric onto it, it takes at least one and half minutes, sewing together just on 3 sides it was 10 minutes a piece. I haven't figured the time yet.....(30 flowers done)
So far seems to pass the pet approval with Chester and Yum Yum.