Sunday, December 27, 2009
Grandmother flower Quilt update
Stashbusting Goals
What I would like to do for 2010
For Chrstmas this year, I received Dave Ramsey's book. I know the purpose is to have no debt, well it hit me while reading it as reducing stash.
I have about 20 ufo's that really need be promoted to quilts.
So step 1: Figure out what I really have as UFO'S--- That might take a year :-) --
Step 2: List all those UFO's on a spreadsheet --That will take another year--
Step 3: Finish the one that is closet to being done
Step 4: Snowball effective time- Take the next closet to being done, etc....
Step 5: Still reading book ......
I hope to have 4 quilts done by April 15th
Stashbusting Week 52
Thursday, December 24, 2009
Merry Christmas to All
Wednesday, December 23, 2009
What craziness happens at Christmas
Tuesday, December 22, 2009
mini vacation
Worked yesterday, now I have four days off in a row. Trying to decide what I should do. I'm thinking treating myself to a pedicure/manicure, quilting time, wrap a present or two for Liz, we got the stockings stuffers done this AM and need to get 1 gift. We had a party at work, my secret santa gave me a gift card to Joanns.
Sunday, December 20, 2009
Stashbusting Week 51
Saturday, December 12, 2009
Stashbusting Week 50
Monday, December 7, 2009
Stashbusting Week 49
Here it is again, another week. I have not been near my machine for weeks. I really need to get back to it.
I did finish 1 flower for the Grandmother Flower Garden Quilt.
So my numbers
Fabric in: 0
Fabric used: 0
I think I had 18 in this year and 14 yds out. I'll figure that out later, going back to bed. I just called in to work with a doozey of a headache.
I noticed everyone has been putting goals up this week, so my goal this week will be:
1 Get up every morning, be thankful of still breathing
2 Work on my Grandmother Flower Garden
3 Put binding on grandsons quilt, so close to a finish.
Sunday, November 29, 2009
Stashbusting Week 48
Check out this beautiful giveaway
Check out this beautiful Angel that Judith from the Netherlands is giving away. Her blog "Smokey from the Netherlands"
http://judiromi.blogspot.com/2009/11/give-away.html
She is working on another beautiful piece it is Little red riding hood, wish I was 1/10th as talented as her.
Go take a peek at her blog.
Sunday, November 22, 2009
Stashbusting Week 47
Sunday, November 15, 2009
Stashbusting Week 46
Nothing in -- Nothing out.
Fabric in this week: 0 yds
Fabric in YTD: 27 yds
Fabric used this week: 0 yds
Fabric used YTD: 23.5 yds
Net Fabric YTD: -3.5 yds
Been working on my Grandmother Flower garden quilt. Started to do some of the fill ins, I started on the bottom , will take more pictures later.
You can see the start of the fill ins, we decided to do straight edges instead of the hexagons edges.
Thursday, November 12, 2009
Still here
Been working on the Grandmother flower garden. I got 2 more flowers finished, also starting on some of the fill in spots. For the finishing of the quilt, instead of ending with hexagons, I'll be making it straight edged. Probably a thousand more white hexagons to add, it feels like a million in it already. I used the plastic hexagons instead of paper, been wondering what to do with the after this quilt, I don't think another GFG will be made by me.
Sunday, November 8, 2009
Stashbusting Week 45
Nothing in --- nothing out yet. So many things on the burner.
More leaves a falling, Yum Yum chasing them. I think it is his highlight of the day, Molly just sits and watches them flutter down to the ground. Funny, we don't have any trees, but our yard is now covered. Probably the 50 mph winds , this week helped the neighbors get rid of theirs :-)
Off to a Thimbeberries meeting....
Sunday, November 1, 2009
Stashbusting Week 44
This picture is from last week, I've been slowly working on it. Less than 10 flowers to go. yea....
Fabric in this week: 00
Fabric in YTD: 27 yards
Fabric used this week: 00
Fabric out YTD: 23.5 yds
Net fabric YTD: -3.5 yds
Added edit: I have been working 2 out 4 lunch hours on it. My work scheduled just started giving us 1 hour lunches instead of a half. So now I had to figure out what to do on them, the other 2 days I walk 15 mins. Hopefully I can lose some weight too!
Sunday, October 25, 2009
Stashbusting Week 43
Nothing this week to say about stashbusting. Only changes is the weather, we started to rain. Here in Oregon, that means 9 more months to go of gray dismal weather. But I got to see the neighbors tree change.
Still working on my grandmother flower garden, finished 2 more :-) Also working on my Thimbleberries BOMs, on month 9, than month 11, the fabric hasn't arrived for block 10 :-(
Fabric added this week: 0 yards
Fabric added to date: 27 yards
Fabric used year to date: 23.5 yards
Net fabric year to date: -3.5 yards
Saturday, October 24, 2009
Pumpkin Patch Primitives GIVE AWAY....
Pumpkin Patch Primitives is having a give away on Halloween.
http://pumpkinpatchprimitivequiltshoppe.blogspot.com/2009/10/its-happy-halloween-giveaway.html
Since I never entered in one, I'm trying :-) just what I need more fabric.
I'm number 426 I think that is a great number, my b-day is 624, so my numbers are there :-)
Sunday, October 18, 2009
Stashbusting Week 42
Fabric added this week: 0 yards
Fabric added to date: 27 yards
Fabric used this week: 0 yards
Fabric used year to date: 23.5 yards
Net fabric year to date: -3.5 yards
I have fallen off the sewing track. This is the same amount as week 37. Nothing really done for 5 weeks, while on vacation I got 9 blocks done for my Thimbleberries quilt, still 2 months behind. Went back to work yesterday, we had our scheduled tweeked abit. I lucked out on the same days off, but now we have hour long lunches. Never in 35 years of working, have I had an hour lunch. Now the question is what to do on that hour. Yesterday I started taking apart ties in hopes to make a tie quilt someday. That was very depressing tho, made me think about my dad and when he wore them. On a happier note, I did finish 2 flowers for my grandmother flower quilt.
Tuesday, October 13, 2009
Back from vacation
Well a few days back, just been vegging, and enjoying it. Today I did some sewing on my Thimbleberries quilt. I finished month 7, than found month 5 and 6. I ran out of fabric for the 3 - 6inch blocks for month 5, I hope to run down to fabric store to do that, but I finished the 12" for month 5. Finished 2 -12" blocks and 7 - 6" blocks
The playpen for the dogs worked out ok, but Molly figured out how to escape the first night in the motorhome. We will have to travel with hard crates instead of a soft one for night time, Molly was rolling that around too. To their benefit they got to sleep in our bed for the evenings, boy was I glad to get my bed back for sleeping, very hard to sleep with 2 -10 pound dogs- very determined not to MOVE.... when I did.
Thursday, October 1, 2009
Let us OUT
Sunday, September 27, 2009
My MESSY Stash
Judy L. at http://www.patchworktimes.com/2009/09/26/show-you-stash/ dared us to show our stash. Good thing she didn't ask us to jump off a bridge, I'm really embarrassed to show it, but I'll own up to the mess.....
Fabric room side 1
Wednesday, September 16, 2009
Stashbusting Week 37
Sunday, September 6, 2009
Stashbusting Week 36
Sunday, August 23, 2009
Stashbusting week 34
So my numbers for this week:
Fabric added this week: 0 yards
Fabric added to date: 25 yards
Fabric used year to date: 17.5 yards
Net fabric year to date: -8.5 yards
I plan on making 2 kits for quilts today, that should start moving numbers again. I now have finished 8 charity quilts, the goal I sent for myself is 20 by end of year.
Sunday, August 16, 2009
Stashbusting week 33
I'm ashamed to say nothing being used here. Been working on charity quilts, but those are precut kits I pick up. http://seagullquilts.blogspot.com/2009/08/charity-quilts.html
So my numbers for this week:
Fabric added this week: 4 yards
Fabric added to date: 22 yards
Fabric used this week: 0 yards
Fabric used year to date: 17.5 yards
Net fabric year to date: -8.5 yards
This is heading like my Weight Watches loses very sloooooooowwww
Wednesday, August 12, 2009
This post is for April
I have been neglecting my computer and daughters. So what have I been up to this past month?
I don't remember, old age set in. Oh yes, lots of laundry every week, vacuum every Sunday and Wednesday, except for today so far, take the dogs out numerous times a day, dishes.
I have been sewing again, this time it has been for charity quilts. Just the tops the group will finish them off, I have 5 done 3 in different steps of completion. Also went to a longarm machine class today, played for 2 hours. I hope to have Jack's quilt done for Christmas.
Sunday, July 5, 2009
Not much happening here
So here it is Sunday again. Went to Weight Watchers, stayed the same for weight this week. Wanted to go to Sisters Oregon this Saturday, for a quilt show. Just found out I can't get any co workers to work for me, no surprise to me. But I gave it a try. I called in on Tuesday sick, had Wed and Thur off- worked on Friday than had Saturday and Sunday off. Saturday I must have slept for 18 hours, woke up in pissy mood today. Went to WW came home fell a sleep for 5 hours, got rid of the headache, than dozed off and on again, no energy. So as you can seen nothing happening here.
Saturday, June 27, 2009
Had a birthday this week
Stashbusting week 25 and 26
Nothing in, nothing out. Been working on my Grandmother flower garden quilt, I have 2 more flowers completed. I haven't recovered 100 % from working 6 days, 2 weeks ago. What regular chores seemed to become major chores. Been walking daily or at least 5.5 days out of 7, still haven't seen the scale move either. Had a birthday in there too, only took a class no fabric. The class was a square n square, seems intesting.
Sunday, June 14, 2009
Stashbusting week 24
To do list:
- Water dogs 6am
- weight watchers lost 2.2 lbs 7:30 am
- feed animals done 6:05am
- walk - 30 minutes done after WW 8am
- laundry 1done 1 to go 9 am
- water dogs again 9 am
- dishes in process 12pm
- --vacuum------
- water dogs again--12:50pm
- Thimbleberries meeting at Quilt store--- should leave credit card home
- watched a movie done
- --dinner--- no clue-----
Tuesday, June 9, 2009
design wall week 2
Sunday, June 7, 2009
Stashbusting week 23
Not much happening on the stashbusting end. I hope to finish a couple of small quilts that I've been working on. This coming week, I'll be working overtime, so it will be interesting to see what I get done.
So my numbers for this week:
Fabric added this week: 0 yards
Fabric added to date: 22 yards
Fabric used this week: 0 yards
Fabric used year to date: 17.5 yards
Net fabric year to date: -4.5 yards --Going the wrong way
Used Spools YTD: 7
Sunday, May 31, 2009
What's on your design wall?
Week 1
Thanks to Judy L. http://www.patchworktimes.com/2009/06/01/whats-on-your-design-wall-2/ for having this extra accountability day, the other one on Sunday is using your stash.
On my wall for WEEK 1 is Grandmother Flower Garden. I have 3 flowers started here, one is 1/2 done the other 2 in the beginning mode.
Stashbusting week 22
Subscribe to:
Posts (Atom)
