Sunday, November 8, 2009

Stashbusting Week 45

Nothing in --- nothing out yet. So many things on the burner.
More leaves a falling, Yum Yum chasing them. I think it is his highlight of the day, Molly just sits and watches them flutter down to the ground. Funny, we don't have any trees, but our yard is now covered. Probably the 50 mph winds , this week helped the neighbors get rid of theirs :-)
Off to a Thimbeberries meeting....

Sunday, November 1, 2009

Stashbusting Week 44

This picture is from last week, I've been slowly working on it. Less than 10 flowers to go. yea....
Fabric in this week: 00
Fabric in YTD: 27 yards
Fabric used this week: 00
Fabric out YTD: 23.5 yds
Net fabric YTD: -3.5 yds
Added edit: I have been working 2 out 4 lunch hours on it. My work scheduled just started giving us 1 hour lunches instead of a half. So now I had to figure out what to do on them, the other 2 days I walk 15 mins. Hopefully I can lose some weight too!

Sunday, October 25, 2009

Stashbusting Week 43

Nothing this week to say about stashbusting. Only changes is the weather, we started to rain. Here in Oregon, that means 9 more months to go of gray dismal weather. But I got to see the neighbors tree change.
Still working on my grandmother flower garden, finished 2 more :-) Also working on my Thimbleberries BOMs, on month 9, than month 11, the fabric hasn't arrived for block 10 :-(
Fabric added this week: 0 yards
Fabric added to date: 27 yards
Fabric used this week: 0 yards
Fabric used year to date: 23.5 yards
Net fabric year to date: -3.5 yards

Saturday, October 24, 2009

Pumpkin Patch Primitives GIVE AWAY....

Pumpkin Patch Primitives is having a give away on Halloween. http://pumpkinpatchprimitivequiltshoppe.blogspot.com/2009/10/its-happy-halloween-giveaway.html Since I never entered in one, I'm trying :-) just what I need more fabric. I'm number 426 I think that is a great number, my b-day is 624, so my numbers are there :-)

Sunday, October 18, 2009

Stashbusting Week 42

Fabric added this week: 0 yards Fabric added to date: 27 yards Fabric used this week: 0 yards Fabric used year to date: 23.5 yards Net fabric year to date: -3.5 yards I have fallen off the sewing track. This is the same amount as week 37. Nothing really done for 5 weeks, while on vacation I got 9 blocks done for my Thimbleberries quilt, still 2 months behind. Went back to work yesterday, we had our scheduled tweeked abit. I lucked out on the same days off, but now we have hour long lunches. Never in 35 years of working, have I had an hour lunch. Now the question is what to do on that hour. Yesterday I started taking apart ties in hopes to make a tie quilt someday. That was very depressing tho, made me think about my dad and when he wore them. On a happier note, I did finish 2 flowers for my grandmother flower quilt.

Tuesday, October 13, 2009

Back from vacation

Yum Yum
Molly
Well a few days back, just been vegging, and enjoying it. Today I did some sewing on my Thimbleberries quilt. I finished month 7, than found month 5 and 6. I ran out of fabric for the 3 - 6inch blocks for month 5, I hope to run down to fabric store to do that, but I finished the 12" for month 5. Finished 2 -12" blocks and 7 - 6" blocks
The playpen for the dogs worked out ok, but Molly figured out how to escape the first night in the motorhome. We will have to travel with hard crates instead of a soft one for night time, Molly was rolling that around too. To their benefit they got to sleep in our bed for the evenings, boy was I glad to get my bed back for sleeping, very hard to sleep with 2 -10 pound dogs- very determined not to MOVE.... when I did.

Thursday, October 1, 2009

Let us OUT

Got a playpen for the dogs for vacation. Molly was very upset she was in there with Yum Yum. I hope to use this while traveling, time will tell.